Analytical Technology A15 Dokumentacja

Przeglądaj online lub pobierz Dokumentacja dla Pomiary, testowanie i kontrola Analytical Technology A15. Analytical Technology A15 Specifications Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 32
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Model A15/76
Turbidity Monitor
Home Office European Office
Analytical Technology, Inc. ATI (UK) Limited
6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park
Collegeville, PA 19426 Delph New Road, Delph
USA Saddleworth OL3 5DE
Ph: (800) 959-0299 Ph: 0800-018-4020
(610) 917-0991 + 44 (0) 1457-873-318
Fax: (610) 917-0992 Fax: + 44 (0) 1457-874-468
Email: sales@analyticaltechnology.com Email: sales@atiuk.com
Przeglądanie stron 0
1 2 3 4 5 6 ... 31 32

Podsumowanie treści

Strona 1 - Model A15/76

Model A15/76 Turbidity Monitor Home Office European Office Analytical Technology, Inc. ATI (UK) Limi

Strona 2 - PRODUCT WARRANTY

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 10 O&M Manual Rev-H (8/11) A special handrail mounting kit (part

Strona 3 - TABLE OF CONTENTS

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 11 O&M Manual Rev-H (8/11) The majority of turbidity applications

Strona 4 - TABLE OF FIGURES

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 12 O&M Manual Rev-H (8/11) Figure 7 below shows the recommended i

Strona 5 - Unpacking

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 13 O&M Manual Rev-H (8/11) Turbidity sensors may also be installe

Strona 6 - Part 1 - Introduction

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 14 O&M Manual Rev-H (8/11) Figure 9 - Flow "T" Assemb

Strona 7 - Electronics Unit

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 15 O&M Manual Rev-H (8/11) For applications where a submersible

Strona 8 - SIDE VIEWFRONT VIEW

16 O&M Manual Rev-H (8/11) Part 3 – Electrical Connections Wiring connections to the A15/76 are made to the back of the monitor. The termina

Strona 9

ATI A15/76 Turbidity Monitor Part 3 – Electrical Connections 17 O&M Manual Rev-H (8/11) DC Powered Monitor Model A15/76 Monitor

Strona 10

ATI A15/76 Turbidity Monitor Part 3 – Electrical Connections 18 O&M Manual Rev-H (8/11) Figure 13 - Remote Sensor Junction Box

Strona 11

19 O&M Manual Rev-H (8/11) Part 4 – Start-Up Prior to operation, recheck electrical connections to be sure everything is in accordance with F

Strona 12

2 O&M Manual Rev-H (8/11) PRODUCT WARRANTY Analytical Technology, Inc. (Manufacturer) warrants to the Customer that if any part(s) of the

Strona 13

ATI A15/76 Turbidity Monitor Part 4 – Startup 20 O&M Manual Rev-H (8/11) Front Panel Lock The key swi

Strona 14

21 O&M Manual Rev-H (8/11) Part 5 - Configuration The electronics for the Turbidity system are designed to be as flexible as possible. A num

Strona 15

ATI A15/76 Turbidity Monitor Part 5 – Configuration 22 O&M Manual Rev-H (8/11) 8. Small S RT: 120s This routine

Strona 16

ATI A15/76 Turbidity Monitor Part 5 – Configuration 23 O&M Manual Rev-H (8/11) 19. AL TYPE: CONT. This routine

Strona 17 - DC Powered Monitor

24 O&M Manual Rev-H (8/11) Part 6 - Operation Turbidity monitors will start to measure aqueous samples as soon as power is applied. Calibr

Strona 18

ATI A15/76 Turbidity Monitor Part 6 – Operation 25 O&M Manual Rev-H (8/11) Manual Low Level Offset Adjustmen

Strona 19 - Part 4 – Start-Up

ATI A15/76 Turbidity Monitor Part 6 – Operation 26 O&M Manual Rev-H (8/11) 1. Refer to Figure 7 on page 11.

Strona 20 - Front Panel Lock

ATI A15/76 Turbidity Monitor Part 6 – Operation 27 O&M Manual Rev-H (8/11) Controls & Alarm Outputs T

Strona 21 - Part 5 - Configuration

ATI A15/76 Turbidity Monitor Part 6 – Operation 28 O&M Manual Rev-H (8/11) The alarm relay will always acti

Strona 22

ATI A15/76 Turbidity Monitor Part 6 – Operation 29 O&M Manual Rev-H (8/11) Auto/Manual/ Simulate Operating M

Strona 23

3 O&M Manual Rev-H (8/11) TABLE OF CONTENTS Unpacking ...

Strona 24 - Part 6 - Operation

ATI A15/76 Turbidity Monitor Part 6 – Operation 30 O&M Manual Rev-H (8/11) Check Signal Display The check

Strona 25 - Setting Sensitivity (Span)

31 O&M Manual Rev-H (8/11) Part 7 - Maintenance The A15/76 Turbidity Monitor will generally provide unattended operation over long periods of

Strona 26

32 O&M Manual Rev-H (8/11) SPARE PARTS LIST PART NO. DESCRIPTION 00-0804 Complete turbidity monitor electronics, panel mount 03-0181 NE

Strona 27 - Controls & Alarm Outputs

4 O&M Manual Rev-H (8/11) TABLE OF FIGURES Figure 1 - Turbidity System w/Submersion Sensor ...

Strona 28 - Analog Output Adjustment

5 O&M Manual Rev-H (8/11) Unpacking When you receive your Turbidity Monitor, open the shipping package and inspect the contents to be sure

Strona 29 - Simulate Mode

6 O&M Manual Rev-H (8/11) Part 1 - Introduction The Model A15/76 is an on-line monitoring system designed for the continuous measurement of t

Strona 30 - Check Signal Display

ATI A15/76 Turbidity Monitor Part 1 - Introduction 7 O&M Manual Rev-H (8/11) Specifications Electronics Unit Range: 4/400 NTU

Strona 31 - Part 7 - Maintenance

8 O&M Manual Rev-H (8/11) Part 2 – Mechanical Installation The main installation requirements for ATI’s Turbidity Monitor are mechanical insta

Strona 32 - SPARE PARTS LIST

ATI A15/76 Turbidity Monitor Part 2 – Mechanical Installation 9 O&M Manual Rev-H (8/11) The optional NEMA 4X wall mount enclosure

Komentarze do niniejszej Instrukcji

Brak uwag